8. The building idea of Dornach
The next picture (Fig. 103): This is the house that was built nearby, the glass house that is now used as a construction office. Some eurythmy practice rooms are inside. It had to be built originally because the glass windows for the building were cut inside it. These glass windows came about in such a way that what is otherwise only artistically executed – that the wall is artistically transparent – is formed in these glass windows right down to the physical level. The motif that had been specified was engraved with a diamond pencil from monochrome glass panes by friends who worked on it for years with tremendous dedication and devotion. This had to be done first in this house. The glass panes are large and a separate studio building had to be erected for this purpose. But it is designed entirely in the style of the whole. Two domes, standing apart from each other, determine the very different shape of the building up to the gate; the whole asymmetry, so down to the stairs, everything is individualized. Those who come here will see that the lock and the door handle are individually designed.